The following thumbnail images show the
completed bridge. The bridge was built to replace an older bridge that the
elements had claimed. The bridge was built with pressure treated pine. It was
designed with an arch in AutoCAD and each board that makes up the beams were cut
from 1:1 scale drawings.
The
bridge took about 4 days to build with 2 men or about 64 man-hours.